Evidence and assurance

A verdict is useful only if another engineer can reconstruct it.

Barrier Intelligence preserves the route from safety-study claim to physical detector vote, including every source, assumption, method, limitation and review decision in between.

Live Barrier Credit RegisterAnonymised reference study
Live Assure3D workstation showing named coverage zones and the Barrier Credit Register with credited, credit-at-risk and credit-lost verdicts.
Scenario-level physical verdictsEngineer countersign retained

Evidence model

Every state says what happened, why and how certain we are.

A compact verdict never replaces the engineering record behind it.

Source documents connected by a provenance ring to an industrial model.
01 / Provenance

Source-linked

Scenario claims, detector data and assumptions retain document, page, revision and extraction confidence.

No orphan assertions
A physical release plume travelling from a nozzle toward an active detector.
02 / Response

Physics-bound

Native plume, concentration, obscuration and timing metrics remain attached to the detector vote.

No score substitution
A controlled engineering review mechanism acting on stacked evidence.
03 / Authority

Review-controlled

Conflicts, limitations, overrides and sign-off decisions are explicit parts of the final package.

No hidden judgement

Standards alignment

Organised around the engineering practices your reviewers already recognise.

Barrier Intelligence supports the work of qualified engineers; it does not claim certification or replace their authority.

ISA-TR84.00.07

Performance-based F&G design

Connect hazard scenarios, detector performance and achieved coverage in a reviewable basis.

BS 60080

Fire and gas system application

Structure the evidence around hazard detection objectives, layout and operational context.

IEC 61511

Safety lifecycle governance

Preserve traceability, assumptions, verification evidence and accountable approval.

SHELL DEP 34.11.20

Detector layout practice

Support rigorous layout assessment while retaining project-specific criteria and limitations.

The assurance package

Designed to move from technical review to action.

The deliverable separates evidence, finding, consequence and remediation.

A

Barrier Credit Register

A scenario-level ledger of claims, physical votes, evidence quality and final disposition.

Review the truth
B

Spatial and gap pack

3D overlays, dynamic MDLS views, dead zones, timing failures and risk-ranked gaps.

See the problem
C

Assurance dossier

Executive finding, method statement, limitations, remediation and qualified-engineer approval.

Act and sign

Governance by design

Deterministic where reproducibility matters. Human where judgement matters.

The analysis can be rerun from the retained inputs and configurations without requiring cloud access to plant data.

01 / Data boundary

Offline-capable

Assure3D can run without operational-technology integration or external model calls.

02 / Reproducibility

Configuration retained

Inputs, solver settings, evidence mappings and revisions travel with the result.

03 / Accountability

Engineer-authorised

The final claim, caveats and remediation remain under qualified professional control.

Bring a live question

Test the evidence chain on one unit and one real assurance decision.

A pilot is scoped around your existing safety studies, detector data and 3D model.

Plan the evidence pilot