Assure3D pilot programme

Start with one unit.End with a defensible answer.

Use the studies and model you already have to verify one live Fire & Gas assurance question. The pilot is bounded, offline-capable and designed to produce a decision-ready engineering package.

Pilot readiness

Most teams already have the inputs needed to begin.

We assess quality and gaps before committing to the verification scope.

Bounded pilot scope connecting engineering inputs, one process unit and a decision-ready finding register.
Required

Safety and detector basis

HAZOP or scenario list, F&G philosophy, mapping report and detector register with coordinates where available.

Feeds: Claims and hardware
Required

Plant geometry

A 3D model, laser scan, CAD export or sufficient as-built drawings for the selected unit.

Feeds: Obstruction and context
Helpful

Operating and change context

Current inventories, ventilation assumptions, recent MOCs and known field constraints.

Feeds: Credible conditions

Engagement sequence

A controlled path from readiness review to signed finding.

Scope stays visible so the pilot answers a precise engineering question.

Scope and readiness

Agree the unit, question, evidence boundary, acceptance criteria and expected decision.

Reconstruct the basis

Ingest the studies, scenario credit, detector register and plant geometry with provenance.

Sweep and review

Sweep the credible physical space, review controlling cases and challenge preliminary gaps.

Sign and deliver

Issue the finding register, spatial findings, remediation priorities, method and limitations for approval, structured around ISA-TR84.00.07.

A strong pilot fit

There is a real claim or decision to test.

  • 01A proposed layout needs independent challenge before issue
  • 02An existing mapping study no longer reflects the plant
  • 03An MOC, audit or incident has raised a coverage question
  • 04A team needs defensible priorities before spending capital

What the pilot is not

A certification shortcut or autonomous safety decision.

  • 01It does not certify the F&G system or replace a qualified engineer
  • 02It does not fill gaps in plant data silently; every inference carries declared uncertainty
  • 03It does not require live OT data or control-system access
  • 04It does not convert weak evidence into optimistic credit

Discuss a pilot

Tell us the decision you need to make.

We will use this to assess fit, identify the minimum input set and propose a bounded first scope.

  • AOne selected unit or module
  • BOne defined assurance question
  • COne traceable engineering package
Assure3D is a functional prototype entering pilot deployment. It supports engineering judgement and does not provide certification.